A 1,764-ton tunnel-borer, after excavating 1.2 miles, was moved to a temporary steel bridge across an Italian river and rebuilt on the far side, where its 41-foot cutting head launched a second tunnel with 18 motors supplying 6.3 megawatts.
- A 1,764-ton tunnel-borer, after excavating 1.2 miles, was moved to a temporary steel bridge across an Italian river and rebuilt on the far side, where its 41-foot cutting head launched a second tunnel with 18 motors supplying 6.3 megawatts. Autonocion.com
- Webbuild begins excavation of the Melato Tunnel on the NaplesβBari rail line geplus.co.uk
- Excavation of the Melato Tunnel on the Naples-Bari High Speed ββRailway has begun. railwaypro.com
- Aurora started the Melito Tunnel drive on the NaplesβBari line. tunnellingjournal.com
- Webbuild begins boring the Melato Tunnel on the Naples-Bari rail project. worldconstructionnetwork.com
Stay updated with the latest alerts on this story:
View Original Coverage